Two new sidings are being added in Lee. At the present time, the railroad must operate
their second train of the day "push-pull" with an engine at both ends because
it turns around at Lee, and there is no place to run the locomotive around the train.
Once these tracks are ready, they won't have that problem any more.

It is So Nice seeing railroads adding new track instead of ripping up historic routes.