Gravel Spur & Northern continued
November 26th, 2006

Trestle Bents are in place.

-

The bents for the tall trestle are now completed. I need to add bracing,
but can do that at the same time the deck panels are installed.
-

This is a very wet place. I used the old palette from the last
rail order as a scaffold, I had a relative dry place to work.
-

These piles were driven into the mud. Some were (un)lucky enough
to hit a rock shelf and had to be cut off, but most never hit anything
solid, so were driven to the right height.
-

This entire area is bogland. Plus we had been getting lots of rain. What's more, it's late
November, and I had to get the bridge supports driven in before the ground freezes for the winter.
-
The last bent ended up squarely in the gravel pile. The next load of rock
will bury the end of the bridge. But I won't need to worry about running off the end.
-

At long last. The gravel pile is within reach.
-

And some nice berries.