Building a Backyard Railroad -- page 5 (July 13th)




On this switch, you can see the drawbar, and a follower drawbar that
holds gauge in the movable rails.



Now let's head west along the north side of the loop...



Around the bend alongside the creek which is now dry.



Along the river route.



Looking back at the stub switch...



and at the bend.



Approaching end-o-rails at the west end.



Looking back again.



End of construction on the west end.



The west end, two weeks later (july 30th)



One more peaceful photo.

On to Next Page
Back to Previous Page