Page 1 image 1. Parts on Arrival. image 2. Frames on Arrival Page 2 Image 3. Turning the Driving Wheels Image 4. Starting to Machine Counterbalance Image 5: Four of the 8 Drivers Completed Image 6: Drivers, Axles and Bearings Page 3 Image 7. Frame, spreaders, plates, and binders Image 8. Rear spreader, Drawbar beam, and Drag beam Image 9: Pilot beam, Front Deck, Pilot truck radius arm hanger Page 4 Image 10. Saddle, Front Deck, Pilot Beam, Frame Plate Image 11: Another view Image 12: Cylinder machining Image 13: Cylinder Machining Image 14: Completed Cylinders and Saddle Page 5 Image 15: Machining Cylinder Covers Image 16: Valve/cylinder covers on. Image 17: Cylinders/Saddle Secured Page 6 Image 18: Bearing assembly Image 19: Quartering and Securing Detail Image 20: Quartering Frame Page 7 Image 21: Cylinder Covers Image 22: Wheels, Axles, Bearings Ready to Roll Page 8 Image 23: Boiler/Smokebox Details Image 24: Pilot and Trailing Truck Wheels Image 25: Main Leaf Springs Image 26: Boiler/Smokebox material Page 9 image 27: Brake Shoes and Arms image 28: Brake Equalizers installed image 29: Spring Clips soldered to top springs and painted Page 10 image 30: Smokebox, Cover, and Door, ready to drill and tap image 31: Drilling Smokebox Cover image 32: Smokebox cover, door, and guard dogs image 33: Make sure the Smokebox is square image 34: Bolting the Smokebox to the Saddle Page 11 image 39: Gene Allen Cab nearing completion image 40: Valve Gear Brackets just need drilled image 41: Reverse Gear Bearings image 42: Rear Valve Gear Beam with Reverse Bearings image 43: Valve Gear Beams and Bearings installed Page 12 image 44: Crosshead Bearings image 45: Crosshead, Bearings, Guides, and Slides image 46: Piston Rod, Crosshead, and Guide image 47: End of Piston in Cylinder image 48: Rod and Slide Asseembly (removed from loco) image 49: Crosshead Slide Mounting Bracket image 50: Milling the Main Rods with the Rotary Table. image 51: Main Rods (minus bearings) Completed. image 52: Test fitting the center connecting rod. image 53: Slitting the front and rear connecting rods. Page 13 image 54: Drop Link image 55: Milling the Center Side Rods. image 56: (almost) completed Center Connecting Rods. image 57: Completed Connecting Rods. Page 14 Image 58 - Pilot Equalizer Connecting Parts Image 59 - Pilot Truck Parts Image 60 - An [almost] assembled Pilot Truck Axle Image 61 - Front view of Pilot Truck Image 62 - Rear view of Pilot Truck Image 63 - Yoke with main yoke pin and swing pins glued on Image 64 -- Springs and saddles attached, underneath view. Image 65 -- Springs and saddles attached, front axle removed. Image 66 -- Completed Pilot Truck. Page 15 Image 67 -- Replaced Pins with 5/16-24 Bolts. Image 68 -- Time to mark the hole in the Pilot Radius Arm. Image 69 -- Frame Modifications for Trailing Truck. Image 70 -- Trailing Truck Parts. Image 71 -- Trailing Truck Frame partly assembled. Image 72 -- Trailing Truck Wheels, Axle, Spacers, Bearings, and Axleboxes. Image 73 -- Axle showing bearing and spacer. Transom Spreader. Image 74 -- Trailing Truck mounted + Rear Radius Arm Hanger. Image 75 -- Saddle Bottom Cover, Front Equalizer Pivot, Radius Bar Pin. Page 16 Image 76 -- Milling the Equalizer Beam. Image 77 -- Milling the Transverse Equalizer. Image 78 -- Lots of new parts installed. Image 79 -- Equalizer for #4 Driver and Links Image 80 -- Rear Equalizer Spring Assemblies Image 81 -- Trailing Truck Coil Spring Holders Image 82 -- Number 4 Driver Equalizer Yokes installed Image 83 -- Rear Equalizer connected to Trailing Truck Page 17 Image 84 -- Brake Cylinder and Levers Image 85 -- The Missing Link Installed Image 86 -- Lots of Wheels Image 87 -- Finally, Back on it's Wheels Image 88 -- Leaf Springs Installed. Still need to be leveled and adjusted Image 89 -- Time for a Side View Image 90 -- Domes countoured and boiler cut to length and sloped. Image 91 -- Cutoff template for the boiler rear slope. Image 92 -- Cutout in Boiler for Firebox + Firebox walls Image 93 -- Fire Door on Boiler Backhead. Page 18 Image 94 -- It's Ken welding on the front firebox wall. Image 95 -- Boiler Outer Shell Ready to Go. Image 96 -- Rear Walkways Bolted to Cab. Image 97 -- Looking Down Image 98 -- Looking Down Inside Cab Image 99 -- Starting to Look Like a Locomotive. Image 100 -- Home Made Cab Roof Hinge. Image 101 -- Test fitting the boiler and cab.. Page 19 Image 102 -- Cab floor, sidesills and rear walkway extensions Image 103 -- Cab Underskirt Image 104 -- Using the laser to check boiler alignment Image 105 -- Welding rear walk forward supports to boiler. Image 106 -- Template for smokebox joining ring holes. Image 107 -- Smokebox joining ring holes drilled. Image 108 -- Getting ready to drill and tap holes in joining ring. Page 20 Image 109 -- Boiler shell and Smokebox joined! Image 110 -- Looking down at the exhaust pipe Image 111 -- Firebox Door - Closed Image 112 -- Firebox Door - Open Image 113 -- Weldnuts and Studs Image 114 -- Dome Bases in Place Image 115 -- Domes Minus Lids Image 116 -- Lids On Page 21 Image 117 -- Smokebox Door Hinges Image 118 -- Front Walk, Steps, and Handrail Image 119 -- Reverse Link Assemblies Image 120 -- Reverse Links with Pins, Bushings and Brackets Image 121 -- Addition of Front Deck Extensions Image 122 -- Halogen Headlight Bulb Page 22 Image 123 -- Valve Liners, Crossheads, and Guides Image 124 -- Template for Valve Liners Image 125 -- Painting the Boiler and Cab Image 127 -- Left Side Rod - front Image 128 -- Left Side Rod - rear Page 23 Image 129 -- Reverse Shaft Arms Image 130 -- Return Cranks and Crank Pins Image 131 -- Eccentric Rods and Hat Bushings Image 132 -- Combination Levers and Pins Image 133 -- Radius Rod Assemblies Image 134 -- Lifting Links and Union Links Image 137 -- Left Side Valve Gear Ready to Run Image 138 -- Attaching Steam Dome to it's Base Image 139 -- Left SIde Running on Air |